Site is in the process of annexation into the City of Hillsboro. Anticipate this being finalized in June 2024.
Zoning will allow industrial and data center development.
FEMA reduced flood plain designation on the site which is now approximately 30,000-32,000 SF flood land. 26% of that can be removed by raising the site one foot. Important to note this land is in Zone X (Flood Plan Designation not Wetland) which allows fill to be added to the site to mitigate wetlands area. Buyer to conduct own due diligence.
Estimation on usable land to be 9.50 acres.
Two tax lots. Does not include the lot connecting to Publos Street.